Recently, the W3S-800 stabilized soil mixing plant by Shantui Janeoo in Sichuan, has been successfully installed and put into commissioning, and will be applied to the construction of Leshan-Ziyang-Tongchuan Highway in the near future.
Shantui Janeoo W3S-800 stabilized soil mixing station aggregate batching system adopts modular pre-assembly, and the aggregate belt conveyor folds the transportation site, which effectively saves the preparation time in the early stage of construction, saves time and effort; The electronic belt scale is controlled by frequency conversion, which can automatically adjust the feeding amount and has higher measurement accuracy. The mixing system adopts liner-free technology, which completely eliminates the trouble of replacing the liner on site, greatly reduces the wear rate of the mixing blades, and is reliable and durable. Shaft-mounted reducer driven, double-shaft high-speed stirring, stable operation, stable soil homogeneity; The original short-pitch spiral powder scale technology reduces the workload of manual scale calibration and improves the measurement accuracy; The whole process of powder weighing is sealed, no dust overflow, and good environmental performance. Centralized intelligent control system, all-round management and control of the whole machine work efficiency, material ratio accuracy and report and other data management, can realize simulated batching, intuitive and reliable, and provide strong raw material support for the production of highway roadbed.
It is reported that Leshan-Ziyang-Tongchuan Highway is located in Neijiang City, Meishan City and Leshan City, and G76 Xiarong Expressway, which will add a fast travel channel for the Sichuan-Chongqing region after its completion, and provide a strong guarantee for strengthening the interconnection of Sichuan-Chongqing Expressway and accelerating the integrated development of Chengdu-Chongqing urban agglomeration.
Post time: Oct-22-2024